Real-world success stories: discovering sustainable construction solutions

BIM Management Practice Sdn Bhd

February 23, 2024
2 mins read

BIM Management Practice Sdn Bhd (BMP) aims to be the premium total integrated construction project delivery & consultancy firm with a focus on delivering smooth running projects with effective dispute management throughout the phases of development, construction and completion. BMP is a TIPD consultancy firm providing BIM Management, Project Management, Facilities Management, Claim and Dispute Management, Document Digitizing & Vendor Management and Training Courses. 

M4 Mixed Development

Client: SUNWAY ISKANDAR SDN BHD 
Product used: CostX Ver 6.7 
Project: Mixed Development 
Value: RM 250 Million 
Timeframe: 2016-2019 

Client’s Requirements 

M4 Mixed Development is a BIM based project that required LOD 300. Revit was selected as the authoring tool and the client requested the QS to undertake 3D measurement. The QS selected CostX for 3D Measurement. 

BMP’s contributions 

BIM Management Practice Sdn Bhd (BMP) undertook 5D-BIM QS Services and was responsible for undertaking the 3D measurement. BMP used CostX to prepare the BQ by using the .dwfx model provided by the architect. BMP also advised the client and other team members on drawing optimisation to comply with BIM requirements and ensure the 3D Model prepared by all respective consultants was simulated as per the guideline and standard provided. 

Making the Difference 

The building model in .dwfx format was imported to CostX. By using a BIM Model Map, the QS undertook 3D Measurement and prepared the Bill of Quantities (BQ). Measured Quantities were then checked against the client’s KPI, and the client was satisfied with the cost estimate and BQ accuracy.